Prices at Track 10 in Downtown start from EGP 15,080,000, with a down payment from EGP 1,656,000 (11%) and monthly instalments from EGP 20,700 over 100 months, with a grace period of 3 months. Last data update: 22 October 2026.
Starts from
15,080,000 EGP
Delivery
4 years
Types
Ground-floor retail, Upper-floor retail
Down payment from
1,656,000 EGP
Installment from
20,700 EGP
Approx. rental return
18% · estimated average
Payment plan
100 month · grace 3 month
Data last updated:Prices and availability may change at the developer at any time.
Units
Sign in to see unit prices and payment plans.
Unit types and their areas. Price columns are locked.
Type
Bedrooms
Area
Price
Down payment
Monthly installment
Ground Retail
—
27–38 sqm
Upper Floor Retail
—
36–58 sqm
Sample units and their feasibility
Two units from the project, rotated weekly. Rent and return figures are estimates.
Ground-floor retail
Area
38 sqm
Bedrooms
0
Handover
2030-04
Price
17,220,000 EGP
Cash price
8,610,000 EGP
Down payment
3,444,000 EGP20%
Instalment
129,150 EGPevery 3 months
Instalment period
20 years
Expected monthly rent
258,300 EGP
Approx. rental return
18%estimated average
Net rental return
14.58%
Payback from rent
6.9 years
Rent covers of instalment
486%
Paid before rent starts
8,566,950 EGP
Upper-floor retail
Area
36 sqm
Handover
2030-04
Price
8,280,000 EGP
Down payment
1,656,000 EGP20%
Instalment
62,100 EGPevery 3 months
Instalment period
20 years
Expected monthly rent
124,200 EGP
Approx. rental return
18%estimated average
Net rental return
14.58%
Payback from rent
6.9 years
Rent covers of instalment
486%
Paid before rent starts
4,119,300 EGP
Frequently asked questions
How much are units in Track 10?
Prices start from EGP 15,080,000. By type: Typical Retail from EGP 8,280,000, Ground Retail from EGP 17,220,000.
What is the payment plan at Track 10?
Down payment from EGP 1,656,000 (11%), instalments over 100 months, grace period of 3 months.
What is the lowest monthly instalment at Track 10?
Monthly instalments start from EGP 20,700.
What unit sizes are available at Track 10?
From 58 sqm.
When is handover at Track 10?
Handover is within 42 months.
What is the expected rental return at Track 10?
About 18% a year (an estimated area average).
Where is Track 10?
Track 10 is in Downtown, The New Capital.
Who is the developer of Track 10?
Track 10 is developed by DIG.
About the project
Track 10 Mall – A Vibrant Heart in the New Administrative Capital
A vibrant location in the new capital Track 10 Mall features a strategic location in the Downtown area, one of the most vibrant, active areas in the Administrative Capital. It is a few minutes from the Government District, the Central Bank, and the monorail station, in addition to the Presidential Palace and the Grand Egyptian Mosque, placing it at the heart of daily events.
Easy access to key landmarks It takes only 3 minutes from the mall to the Green River, while the New Administrative Capital Airport is only about 20 minutes away. The mall is also located close to the central bus station, easing mobility for visitors and workers.
Project area Track 10 Mall spans a large area, designed to provide a fully integrated experience combining services, commerce, and administration, while maintaining a modern character in the building's architectural planning.
Advanced technological services The project includes smart infrastructure including a smart building management system (BMS), and advanced security and surveillance systems, in addition to high-speed internet and fully integrated digital services to meet the needs of companies and business owners.
Comfort and relaxation services Spaces have been dedicated for entertainment and relaxation, including open terraces, green spaces, and cafes and restaurants with stunning views, boosting the experience of both visitors and workers alike.
Business support facilities The mall includes multi-purpose meeting rooms, and conference halls equipped with the latest technology, alongside co-working spaces to meet the needs of startups and business owners.
A central ventilation and air conditioning system The mall was designed with a central ventilation system and highly efficient air conditioning to ensure user comfort at various times, in line with global environmental standards.
and handover is within 4 years. across 21 plans on offer. The nearest alternative is "Grand Kanyon" 0.1 km away, among 3 alternatives within the project's range. Compared with 203 projects recorded in Downtown.
Available unit types are Ground Retail, Typical Retail, and the smallest area is 27 m². Unit areas range from 27 to 58 m².
The project offers Ground Retail and Upper Floor Retail, and handover starting in 2030.